{"id":18080,"date":"2023-12-12T15:18:19","date_gmt":"2023-12-12T14:18:19","guid":{"rendered":"https:\/\/www.red-on-line.com\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/"},"modified":"2023-12-12T15:18:50","modified_gmt":"2023-12-12T14:18:50","slug":"brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems","status":"publish","type":"post","link":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/","title":{"rendered":"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems"},"content":{"rendered":"<div  class=\"strate alignfull\" style=\" background-position: 50% 50%;\"><div class=\"centrage\">\n\n<p class=\"has-white-color has-color-5-background-color has-text-color has-background has-medium-font-size\">In order to meet the objectives of reducing the environmental impact of the building sector, the Brussels-Capital Region has introduced a number of minimum requirements that technicians must meet when servicing heating and air conditioning systems. Depending on the type of maintenance, it should be carried out at least once a year. Frequencies for each system are detailed in Appendix 1 of the decree (see source).<\/p>\n\n\n\n<p class=\"has-medium-font-size\"><strong>Maintenance requirements apply to:<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\"><br>\u2022 air handling units<br>\u2022 ventilation networks<br>\u2022 refrigeration systems and heat pumps<br>\u2022 active and passive ventilation systems, except in the case of intake units or ventilation networks<\/p>\n\n\n\n<p class=\"has-medium-font-size\"><strong>According to the minimum maintenance requirements for these systems, a certified technician must:<\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size\"><br>\u2022 check the tightness of all connections<br>\u2022 check the level of corrosion<br>\u2022 clean the mechanisms<br>\u2022 check filters for wear and clogging<br>\u2022 measure the flow and return temperatures of the circuits<br>\u2022 check that the heat produced is being dissipated<br>\u2022 check water circuits<br>\u2022 check regulation for heating, air-conditioning and ventilation systems<br>\u2022 check boilers<br>\u2022 check domestic hot water (DHW) heaters.<\/p>\n\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":17,"featured_media":15662,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[678],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems<\/title>\n<meta name=\"description\" content=\"In order to meet the objectives of reducing the environmental impact of the building sector, the Brussels-Capital Region has introduced a number of minimum requirements that technicians must meet\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems\" \/>\n<meta property=\"og:description\" content=\"In order to meet the objectives of reducing the environmental impact of the building sector, the Brussels-Capital Region has introduced a number of minimum requirements that technicians must meet\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/\" \/>\n<meta property=\"og:site_name\" content=\"Red On line (COM)\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-12T14:18:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-12T14:18:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.red-on-line.com\/app\/uploads\/sites\/2\/2022\/07\/crystal-kwok-XUEdfpPIhXg-unsplash-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lnardelli\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.red-on-line.com\/#website\",\"url\":\"https:\/\/www.red-on-line.com\/\",\"name\":\"Red On line (COM)\",\"description\":\"Un site utilisant Les sites de Red On Line\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.red-on-line.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#primaryimage\",\"url\":\"https:\/\/www.red-on-line.com\/app\/uploads\/sites\/2\/2022\/07\/crystal-kwok-XUEdfpPIhXg-unsplash-scaled.jpg\",\"contentUrl\":\"https:\/\/www.red-on-line.com\/app\/uploads\/sites\/2\/2022\/07\/crystal-kwok-XUEdfpPIhXg-unsplash-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#webpage\",\"url\":\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/\",\"name\":\"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems\",\"isPartOf\":{\"@id\":\"https:\/\/www.red-on-line.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#primaryimage\"},\"datePublished\":\"2023-12-12T14:18:19+00:00\",\"dateModified\":\"2023-12-12T14:18:50+00:00\",\"author\":{\"@id\":\"https:\/\/www.red-on-line.com\/#\/schema\/person\/d1bb061529cb765efb53010e23a5c45e\"},\"description\":\"In order to meet the objectives of reducing the environmental impact of the building sector, the Brussels-Capital Region has introduced a number of minimum requirements that technicians must meet\",\"breadcrumb\":{\"@id\":\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.red-on-line.com\/gb\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.red-on-line.com\/#\/schema\/person\/d1bb061529cb765efb53010e23a5c45e\",\"name\":\"lnardelli\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.red-on-line.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1a30aeb88baaf0da87438e6bea21889d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1a30aeb88baaf0da87438e6bea21889d?s=96&d=mm&r=g\",\"caption\":\"lnardelli\"},\"url\":\"https:\/\/www.red-on-line.com\/gb\/blog\/author\/lnardelli\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems","description":"In order to meet the objectives of reducing the environmental impact of the building sector, the Brussels-Capital Region has introduced a number of minimum requirements that technicians must meet","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/","og_locale":"en_GB","og_type":"article","og_title":"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems","og_description":"In order to meet the objectives of reducing the environmental impact of the building sector, the Brussels-Capital Region has introduced a number of minimum requirements that technicians must meet","og_url":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/","og_site_name":"Red On line (COM)","article_published_time":"2023-12-12T14:18:19+00:00","article_modified_time":"2023-12-12T14:18:50+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.red-on-line.com\/app\/uploads\/sites\/2\/2022\/07\/crystal-kwok-XUEdfpPIhXg-unsplash-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"lnardelli","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.red-on-line.com\/#website","url":"https:\/\/www.red-on-line.com\/","name":"Red On line (COM)","description":"Un site utilisant Les sites de Red On Line","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.red-on-line.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#primaryimage","url":"https:\/\/www.red-on-line.com\/app\/uploads\/sites\/2\/2022\/07\/crystal-kwok-XUEdfpPIhXg-unsplash-scaled.jpg","contentUrl":"https:\/\/www.red-on-line.com\/app\/uploads\/sites\/2\/2022\/07\/crystal-kwok-XUEdfpPIhXg-unsplash-scaled.jpg","width":2560,"height":1707},{"@type":"WebPage","@id":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#webpage","url":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/","name":"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems","isPartOf":{"@id":"https:\/\/www.red-on-line.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#primaryimage"},"datePublished":"2023-12-12T14:18:19+00:00","dateModified":"2023-12-12T14:18:50+00:00","author":{"@id":"https:\/\/www.red-on-line.com\/#\/schema\/person\/d1bb061529cb765efb53010e23a5c45e"},"description":"In order to meet the objectives of reducing the environmental impact of the building sector, the Brussels-Capital Region has introduced a number of minimum requirements that technicians must meet","breadcrumb":{"@id":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.red-on-line.com\/gb\/blog\/brussels-capital-region-minimum-maintenance-requirements-for-type-2-heating-air-conditioning-and-ventilation-systems\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.red-on-line.com\/gb\/"},{"@type":"ListItem","position":2,"name":"Brussels-Capital Region: minimum maintenance requirements for type 2 heating, air conditioning and ventilation systems"}]},{"@type":"Person","@id":"https:\/\/www.red-on-line.com\/#\/schema\/person\/d1bb061529cb765efb53010e23a5c45e","name":"lnardelli","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.red-on-line.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1a30aeb88baaf0da87438e6bea21889d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1a30aeb88baaf0da87438e6bea21889d?s=96&d=mm&r=g","caption":"lnardelli"},"url":"https:\/\/www.red-on-line.com\/gb\/blog\/author\/lnardelli\/"}]}},"_links":{"self":[{"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/posts\/18080"}],"collection":[{"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/comments?post=18080"}],"version-history":[{"count":1,"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/posts\/18080\/revisions"}],"predecessor-version":[{"id":18082,"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/posts\/18080\/revisions\/18082"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/media\/15662"}],"wp:attachment":[{"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/media?parent=18080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/categories?post=18080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.red-on-line.com\/gb\/wp-json\/wp\/v2\/tags?post=18080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}